I am happy to say that the outside drain tile is complete... Although we still have to complete the inside drain tile before the basement floor is poured. Since the outside is done, we have been busy backfilling around the sides of the basement. Our garage walls were poured last week. The thicker garage footings, thicker walls, and more steel makes our garage super strong. Between yesterday and today we have had 7 loads of crushed concrete delivered for our garage. My dad and uncle helped load the concrete into the garage hole. Everything is starting to come together -- so excited!
Garage Foundation...
Super Footings...
Dimple wrap for additional waterproofing...
Backfilling...
My brother's machine
My dad's loader
Don't even ask how much that amount of crushed concrete costs...