Tuesday, December 30, 2014
Day 184 - Garage Floor Poured
Day 184 and the garage floor has been poured. Although it's very cold outside, we are heating the garage so the cement cures appropriately. The first cement truck showed up about 9:30am and the entire job took about one and a half trucks.
Monday, December 29, 2014
Day 183 - Moving Slowly
It's day 183 and john and I are on break from work. We are prepping the garage and basement for the floors to be poured soon. We ordered our fireplace and the rough mechanical work has been started.
Here is one shot of the basement plumbing under the floor...
Roof work is almost complete...
Stay tuned for cement pics soon!
Monday, November 24, 2014
Day 148 - Cold Weather
This weekend brought slightly warmer weather but it also brought rain. The weather keeps delaying our roof but we are getting there. We burned all of our windows boxes and some wood scraps, trying to keep the lot clean and organized.
Tuesday, November 18, 2014
Day 142 - It's Snowing
It's day 142 and we have snow! It's bitterly cold too, which is slowing down the final finishes of our roof.
Here is a shot from this weekend. We spent two days cleaning up our lumber scraps.
Wednesday, October 29, 2014
Day 122 - Electrical box installed
Today the electrical meter box was installed at the house. Leave it to john to get the commercial grade box for our home. Today our front door was delivered as well. The white construction door will be used until we are ready to install the finished door, this protects our door from the construction activity.
Monday, October 27, 2014
Day 120 - Windows in!
Last Thursday (Day 116) the windows were finally installed. The carpentry crew finished up the final details by Friday (Day 117). The roofer came over the weekend and finished most of the house roof. He will come back next weekend to finish the garage roofing.
Front of house...
Back view...
Living Room...
Garage arches...
Basement Drain Tile...
Sump system complete...
Sump basin working...
Front door...
Garage territory
Wednesday, October 15, 2014
Day 109 - Rainy Weather
It's day 109 and all this week has brought so far is rain! The past Sunday the roofing crew finished a good portion of the roof.
John and I began the drain tile in the basement so we spent the weekend full of mud!
Carpenters should be coming on Monday to finish setting our lovely windows!
Friday, October 10, 2014
Day 104 - Roofing Material Delivered
It's day 104 and our roofing material was delivered to the lot. Tomorrow the crew will come to begin the roof while we begin the drain tile for the basement.
Roofing materials delivered on the roof, of course...
Day 101 - Roofing Chosen
It's day 101 and we decided on our roofing shingles. Roofing material should be delivered Friday and our roofing crew will begin work on Saturday.
Sunday, October 5, 2014
Day 99 - Beginning of Windows
It's day 99 and the crew began this past Friday by installing the windows. Unfortunately, bad weather came and they were only able to start on one window.
The sun came out today and hopefully the weather holds out tomorrow so the crew can finish the windows.
Thursday, October 2, 2014
Day 96 - Framing Finishes
It's day 96 and the crew completed the staircases for the garage to basement, garage to bonus room and first floor to basement stairs. The crew also completed the floor for the bonus room and began the arches for the entry ways.
Windows were delivered today...
Bonus room staircase...
Bonus room...
One of the arches...
Basement staircase on right with temporary railing...
Wednesday, October 1, 2014
Day 95 - Finishing Touches to Rough Framing
It's day 95 and the carpentry crew worked on finishing the hand framing required in the master bedroom and dining room. They also started building the stairs for the basement and removed the 2x4's from each doorway.
Here are parts of the basement staircase which leads to the first floor...
Here is the framing of our double stepped ceiling in the living room...
Master closet :)
View of foyer and office...
Tomorrow our windows will be delivered to the lot and if the weather holds, the crew will start installing on Friday.